Solar on a midlife or failing roof often costs more than re-roofing first. Walk through this before you sign a panel contract.

Roof readiness

  • Roof age & remaining useful life documented
  • No active leaks or soft decking
  • Structural load review if adding heavy tile later
  • HOA or historic approval if required

Contract & warranty

  • Who pays for removal and reinstall if roof fails in 10 years?
  • Penetration warranty — roofer vs solar installer
  • Production guarantee tied to shade analysis, not sales deck only
  • Lease vs loan vs cash — ownership and transfer rules clear

Sequencing

  • Re-roof completed and inspected before racking install
  • Electrical panel capacity confirmed (MPU if needed)
  • Utility interconnection timeline realistic
  • HEAR or tax credits verified for eligible equipment