If two or more items apply, pause and collect another written quote. Pair with our interactive quote scorecard on the vetting page.

Walk away signals

  • Storm chaser with no verifiable local address after hail
  • Pressure to sign today for materials discount or expiring credit
  • Cash-only, no contract, or lump-sum quote without line items
  • Bid far below peers — missing tear-off, permits, or decking
  • Financing paperwork before written equipment and labor scope

Solar-specific

  • Lease presented as free panels without escalator disclosure
  • No written roof penetration or removal-and-reinstall clause
  • Production guarantee without shade analysis on tree-lined lots
  • Installer cannot name racking and flashing manufacturer

Verify anyway

  • Active trade license on state board (not just LLC filing)
  • GL and workers comp certificates naming your address
  • Manufacturer certification (GAF, CertainTeed, NABCEP) if claimed
  • Payment schedule ≤33% upfront before materials on site
All downloads